Robust production optimization with capacitance-resistance model as precursor
DOI10.1007/s10596-017-9666-8zbMath1405.90090OpenAlexW2691272432MaRDI QIDQ1785168
A. J. Hong, R. B. Bratvold, Geir Nævdal
Publication date: 28 September 2018
Published in: Computational Geosciences (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10596-017-9666-8
decision-makingwater injectioncomputational costgeological uncertaintyensemble-based optimizationcapacitance-resistance modelgrid-based reservoir modelmodel-based hydrocarbon production optimizationproxy modelrobust production optimizationvalue of verisimilitude
Applications of mathematical programming (90C90) Stochastic programming (90C15) Flows in porous media; filtration; seepage (76S05) Geological problems (86A60)
Cites Work
This page was built for publication: Robust production optimization with capacitance-resistance model as precursor