Minimizing the number of switch instances on a flexible machine in polynomial time
From MaRDI portal
Publication:1785367
DOI10.1016/j.orl.2015.04.001zbMath1408.90119OpenAlexW2077245622MaRDI QIDQ1785367
David Adjiashvili, Kevin Zemmer, Sandro Bosio
Publication date: 28 September 2018
Published in: Operations Research Letters (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.orl.2015.04.001
Related Items (3)
Improved heuristic algorithms for the job sequencing and tool switching problem ⋮ An algorithmic framework for tool switching problems with multiple objectives ⋮ A simple and effective hybrid genetic search for the job sequencing and tool switching problem
Cites Work
- Scheduling with few changes
- Production planning problems in printed circuit board assembly
- The tool switching problem revisited
- Optimization, approximation, and complexity classes
- A column generation approach to job grouping for flexible manufacturing systems
- Models Arising from a Flexible Manufacturing Machine, Part I: Minimization of the Number of Tool Switches
- Models Arising from a Flexible Manufacturing Machine, Part II: Minimization of the Number of Switching Instants
- Optimal tooling policy for a tool switching problem of a flexible machine with automatic tool transporter
- Hamilton Paths in Grid Graphs
This page was built for publication: Minimizing the number of switch instances on a flexible machine in polynomial time