Approximability of total weighted completion time with resource consuming jobs
From MaRDI portal
Publication:1785443
DOI10.1016/j.orl.2015.09.004zbMath1408.90133OpenAlexW1747656568MaRDI QIDQ1785443
Publication date: 28 September 2018
Published in: Operations Research Letters (Search for Journal in Brave)
Full work available at URL: http://real.mtak.hu/26096/1/weighted_compl_rev2.pdf
Related Items (9)
Minimizing makespan on a single machine with release dates and inventory constraints ⋮ Approximation schemes for parallel machine scheduling with non-renewable resources ⋮ EPTAS for load balancing problem on parallel machines with a non-renewable resource ⋮ Minimizing total weighted completion time on a single machine subject to non-renewable resource constraints ⋮ A tight approximation ratio of a list scheduling algorithm for a single-machine scheduling problem with a non-renewable resource ⋮ New complexity and approximability results for minimizing the total weighted completion time on a single machine subject to non-renewable resource constraints ⋮ EPTAS for load balancing problem on parallel machines with a non-renewable resource ⋮ A Faster FPTAS for a Supply Chain Scheduling Problem to Minimize Holding Costs with Outsourcing ⋮ An FPTAS of minimizing total weighted completion time on single machine with position constraint
Cites Work
- Unnamed Item
- Exact algorithms for inventory constrained scheduling on a single machine
- Approximation schemes for single machine scheduling with non-renewable resource constraints
- Reductions between scheduling problems with non-renewable resources and knapsack problems
- Single machine scheduling problems with financial resource constraints: some complexity results and properties
- Complexity of single machine scheduling subject to nonnegative inventory constraints
- Scheduling subject to nonrenewable-resource constraints
- Structure of a simple scheduling polyhedron
- Scheduling of inventory releasing jobs to minimize a regular objective function of delivery times
- Basic scheduling problems with raw material constraints
- The Complexity of Flowshop and Jobshop Scheduling
- Handbook on Scheduling
This page was built for publication: Approximability of total weighted completion time with resource consuming jobs