Solving a finite horizon EPQ problem with backorders
From MaRDI portal
Publication:1789475
DOI10.1016/j.apm.2013.03.015zbMath1426.90034OpenAlexW2045687361MaRDI QIDQ1789475
Wan-Tsu Wang, Ming-Chang Lee, Leopoldo Eduardo Cárdenas-Barrón, Hui-Ming Wee
Publication date: 10 October 2018
Published in: Applied Mathematical Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.apm.2013.03.015
Related Items (6)
Stochastic machine breakdown and discrete delivery in an imperfect inventory-production system ⋮ A lot sizing model with advance payment and planned backordering ⋮ Note on ``The derivation of EOQ/EPQ inventory models with two backorders costs using analytic geometry and algebra ⋮ Partial trade-credit policy of retailer with exponentially deteriorating items ⋮ Inventory lot-size policies for deteriorating items with expiration dates and advance payments ⋮ Production inventory models for deteiorative items with three levels of production and shortages
Cites Work
- An inventory model with reliability in an imperfect production process
- An EOQ model with delay in payments and stock dependent demand in the presence of imperfect production
- Solving the vendor-buyer integrated inventory system with arithmetic-geometric inequality
- The derivation of EOQ/EPQ inventory models with two backorders costs using analytic geometry and algebra
- The economic lot size of the integrated vendor-buyer inventory system derived without derivatives: a simple derivation
- An EPQ model with inflation in an imperfect production system
- Economic production quantity model with repair failure and limited capacity
- A production-inventory model with probabilistic deterioration in two-echelon supply chain management
- A note on the economic lot size of the integrated vendor-buyer inventory system derived without derivatives
- A modified method to compute economic order quantities without derivatives by cost-difference comparisons
- A finite replenishment model with increasing demand under inflation
- A simple method to compute economic order quantities: some observations
- A new solution method for the finite-horizon discrete-time EOQ problem
- A simple method to compute economic order quantities
- Some comments on ``A simple method to compute economic order quantities
- An EOQ model with delay in payments and time varying deterioration rate
- Optimizing the economic lot size of a three-stage supply chain with backordering derived without derivatives
- A discrete EOQ problem is solvable in \(O(\log n)\) time
- Multiproduct single-machine production system with stochastic scrapped production rate, partial backordering and service level constraint
This page was built for publication: Solving a finite horizon EPQ problem with backorders