Optimal research and numerical simulation for scheduling no-wait flow shop in steel production
From MaRDI portal
Publication:1789962
DOI10.1155/2013/498282zbMath1397.90197DBLPjournals/jam/YuanJJT13OpenAlexW2038514667WikidataQ59002657 ScholiaQ59002657MaRDI QIDQ1789962
Jinping Huang, Yuanwei Jing, Huawei Yuan, Tao Ren
Publication date: 10 October 2018
Published in: Journal of Applied Mathematics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2013/498282
Related Items (2)
Multi-agent scheduling in a no-wait flow shop system to maximize the weighted number of just-in-time jobs ⋮ A survey of scheduling problems with no-wait in process
This page was built for publication: Optimal research and numerical simulation for scheduling no-wait flow shop in steel production