Integer programming models for hierarchical workforce scheduling problems including excess off-days and idle labour times
From MaRDI portal
Publication:1792014
DOI10.1016/j.apm.2013.04.006zbMath1427.90154OpenAlexW2083082982MaRDI QIDQ1792014
Publication date: 11 October 2018
Published in: Applied Mathematical Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.apm.2013.04.006
Integer programming (90C10) Deterministic scheduling theory in operations research (90B35) Theory of organizations, manpower planning in operations research (90B70)
Related Items (2)
Machine scheduling in production: a content analysis ⋮ Designing an annual leave scheduling policy: case of a financial center
Cites Work
- An algorithm for single shift scheduling of hierarchical workforce
- Single-shift off-day scheduling of a hierarchical workforce with variable demands
- Staff scheduling and rostering: a review of applications, methods and models.
- Integer programming to schedule a hierarchical workforce with variable demands
- Survey, categorization, and comparison of recent tour scheduling literature
- An integer programming model for hierarchical workforce scheduling problem
- Off-Day Scheduling with Hierarchical Worker Categories
- An Algorithm For Multiple Shift Scheduling of Hierarchical Workforce On Four-Day Or Three-Day Workweeks
This page was built for publication: Integer programming models for hierarchical workforce scheduling problems including excess off-days and idle labour times