A two-stage assembly-type flowshop scheduling problem for minimizing total tardiness

From MaRDI portal
Publication:1793450

DOI10.1155/2016/6409321zbMath1400.90170OpenAlexW2485457262WikidataQ59140882 ScholiaQ59140882MaRDI QIDQ1793450

June-Young Bang, Ju-Yong Lee

Publication date: 12 October 2018

Published in: Mathematical Problems in Engineering (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1155/2016/6409321




Related Items (2)



Cites Work


This page was built for publication: A two-stage assembly-type flowshop scheduling problem for minimizing total tardiness