Heuristic and exact algorithms for the two-machine just in time job shop scheduling problem
From MaRDI portal
Publication:1793464
DOI10.1155/2016/6591632zbMath1400.90165OpenAlexW2553786100WikidataQ58839247 ScholiaQ58839247MaRDI QIDQ1793464
Mohammed Al-Salem, Leonardo Bedoya-Valencia, Ghaith Rabadi
Publication date: 12 October 2018
Published in: Mathematical Problems in Engineering (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2016/6591632
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Dynamic programming (90C39)
Related Items
Cites Work
- Unnamed Item
- Minimizing total tardiness and earliness on unrelated parallel machines with controllable processing times
- Minimizing weighted earliness-tardiness on parallel machines using hybrid metaheuristics
- Two-machine flow shop scheduling with nonregular criteria
- Sequencing a single machine with due dates and deadlines: An ILP-based approach to solve very large instances
- A V-shape property of optimal schedule of jobs about a common due date
- Equivalence of mean flow time problems and mean absolute deviation problems
- Scheduling around a small common due date
- A survey of the state-of-the-art of common due date assignment and scheduling research
- Variable neighbourhood search and mathematical programming for just-in-time job-shop scheduling problem
- Scheduling with common due date, earliness and tardiness penalties for multimachine problems: a survey
- On the complexity and some properties of multi-stage scheduling problems with earliness and tardiness penalties
- A branch-and-bound algorithm for the early/tardy machine scheduling problem with a common due-date and sequence-dependent setup time
- Minimizing the sum of absolute deviations about a common due date for the two-machine flow shop problem
- Lagrangian bounds for just-in-time job-shop scheduling
- Permutation flow shop scheduling with earliness and tardiness penalties
- A Meta-RaPS for the early/tardy single machine scheduling problem
- Development of a hybrid metaheuristic to minimise earliness and tardiness in a hybrid flowshop with sequence-dependent setup times
- Minimizing the sum of absolute lateness in single-machine and multimachine scheduling
- Minimizing the average deviation of job completion times about a common due date
- Sequencing with Earliness and Tardiness Penalties: A Review
- Single CNC machine scheduling with controllable processing times and multiple due dates
- Minimizing mean absolute deviation of completion times about a common due date
- Single-machine scheduling to minimize absolute deviation of completion times from a common due date
- Earliness-Tardiness Scheduling Problems, I: Weighted Deviation of Completion Times About a Common Due Date
- Earliness–Tardiness Scheduling Problems, II: Deviation of Completion Times About a Restrictive Common Due Date
- Parallel-Machine Scheduling Problems with Earliness and Tardiness Penalties
- Scheduling unit processing time jobs on an m-machine flow-shop
- Single Machine Scheduling with Deadlines to Minimize the Weighted Number of Tardy Jobs
- Scheduling in a two-machine flowshop with batch processing machine(s) for earliness/tardiness measure under a common due date