An integrated multiechelon logistics model with uncertain delivery lead time and quality unreliability
From MaRDI portal
Publication:1793670
DOI10.1155/2016/8494268zbMath1400.90048OpenAlexW2337294708WikidataQ59140938 ScholiaQ59140938MaRDI QIDQ1793670
Publication date: 12 October 2018
Published in: Mathematical Problems in Engineering (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1155/2016/8494268
Transportation, logistics and supply chain management (90B06) Inventory, storage, reservoirs (90B05)
Cites Work
- A hybrid vendor managed inventory and redundancy allocation optimization problem in supply chain management: an NSGA-II with tuned parameters
- Robust and reliable forward-reverse logistics network design under demand uncertainty and facility disruptions
- A stochastic aggregate production planning model in a green supply chain: considering flexible lead times, nonlinear purchase and shortage cost functions
- Mixture inventory model with back orders and lost sales for variable lead time demand with the mixtures of normal distribution
- Inventory Models Involving Lead Time as a Decision Variable
- A multi-echelon integrated JIT inventory model using the time buffer and emergency borrowing policies to deal with random delivery lead times
This page was built for publication: An integrated multiechelon logistics model with uncertain delivery lead time and quality unreliability