Addendum: Some preemptive open shop scheduling problems with a renewable or a nonrenewable resource
From MaRDI portal
Publication:1801674
DOI10.1016/0166-218X(93)90172-KzbMath0775.90241WikidataQ57387901 ScholiaQ57387901MaRDI QIDQ1801674
Dominique de Werra, Jacek Błażewicz
Publication date: 31 August 1993
Published in: Discrete Applied Mathematics (Search for Journal in Brave)
Deterministic scheduling theory in operations research (90B35) Edge subsets with special properties (factorization, matching, partitioning, covering and packing, etc.) (05C70) Coloring of graphs and hypergraphs (05C15)
Related Items (3)
Scheduling the two-machine open shop problem under resource constraints for setting the jobs ⋮ Four decades of research on the open-shop scheduling problem to minimize the makespan ⋮ Open shop scheduling problems with conflict graphs
This page was built for publication: Addendum: Some preemptive open shop scheduling problems with a renewable or a nonrenewable resource