Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Merge two items
In other projects
MaRDI portal item
Discussion
View source
View history
Purge
English
Log in

A branch and bound based heuristic for multi-product resource constrained scheduling problem in FMS environment

From MaRDI portal
Publication:1806642
Jump to:navigation, search

DOI10.1016/S0377-2217(97)00433-5zbMath0933.90030MaRDI QIDQ1806642

Bimal K. Modi, Kripa Shanker

Publication date: 8 November 1999

Published in: European Journal of Operational Research (Search for Journal in Brave)


zbMATH Keywords

branch and boundflexible manufacturing system0-1 integer linear programmingresource flexibilitymultiple-product resource-constrained scheduling


Mathematics Subject Classification ID

Polyhedral combinatorics, branch-and-bound, branch-and-cut (90C57) Deterministic scheduling theory in operations research (90B35) Boolean programming (90C09)


Related Items (2)

Formulating and solving a multi-mode resource-collaboration and constrained scheduling problem (MRCCSP) ⋮ Scheduling flexible manufacturing cells using Tabu Search




Cites Work

  • A multiobjective, multi-level heuristic for dynamic resource constrained scheduling problems
  • Solving a bicriterion scheduling problem




This page was built for publication: A branch and bound based heuristic for multi-product resource constrained scheduling problem in FMS environment

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:1806642&oldid=14166818"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
This page was last edited on 1 February 2024, at 09:19.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki