Resource-constrained project scheduling: Notation, classification, models, and methods
From MaRDI portal
Publication:1806880
DOI10.1016/S0377-2217(98)00204-5zbMath0937.90030OpenAlexW2038345112MaRDI QIDQ1806880
Peter Brucker, Andreas Drexl, Klaus Neumann, Erwin Pesch, Rolf H. Möhring
Publication date: 14 June 2000
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0377-2217(98)00204-5
classification schemeconstraint propagationminimum and maximum time lagsmulti-mode casestochastic activity durationsnotationproject scheduling/resource constraintsnonregular objectivessingle-mode casetime-cost tradeoffs
Related Items
A column-generation-based algorithm for a resource-constrained project scheduling problem with a fractional shared resource, Solving multi-mode time–cost–quality trade-off problems under generalized precedence relations, Optimization Strategies for Resource-Constrained Project Scheduling Problems in Underground Mining, Scheduling the production of rolling ingots: industrial context, model, and solution method, Branch-and-Cut-and-Price algorithms for the preemptive RCPSP, On the Optimal Control of Parallel Processing Networks with Resource Collaboration and Multitasking, Exact Branch-Price-and-Cut for a Hospital Therapist Scheduling Problem with Flexible Service Locations and Time-Dependent Location Capacity, EFFICIENT GRID SCHEDULING THROUGH THE INCREMENTAL SCHEDULE-BASED APPROACH, Project scheduling to minimize the makespan under flexible resource profiles and marginal diminishing returns of the resource, An iterative time‐bucket refinement algorithm for a high‐resolution resource‐constrained project scheduling problem, R-SALSA: a branch, bound, and remember algorithm for the workload smoothing problem on simple assembly lines, Modeling frameworks for the multi‐skill resource‐constrained project scheduling problem: a theoretical and empirical comparison, Local search approaches for the test laboratory scheduling problem with variable task grouping, An Improved Genetic Algorithm for the Resource-Constrained Project Scheduling Problem, An Image-Based Approach to Detecting Structural Similarity Among Mixed Integer Programs, A prediction model for ranking branch-and-bound procedures for the resource-constrained project scheduling problem, On the complexity of efficient multi-skilled team composition, A data-driven \textit{meta}-learning recommendation model for multi-mode resource constrained project scheduling problem, The vehicle routing problem with time windows and flexible delivery locations, Resource-constrained multi-project scheduling problem: a survey, Tabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertainty, Tabu search for proactive project scheduling problem with flexible resources, Mixed Integer Linear Programming for a Real-World Parallel Machine Scheduling Problem with Workforce and Precedence Constraints, A review of synchronization problems in parts-to-picker warehouses, Adaptive multimeme algorithm for flexible job shop scheduling problem, Unnamed Item, Research on resources optimisation deployment model and algorithm for collaborative manufacturing process, New representation to reduce the search space for the resource-constrained project scheduling problem, SCHEDULING THE HARVESTING OPERATIONS OF A FOREST BLOCK: A CASE STUDY, Multilevel capacitated lot-sizing and resource-constrained project scheduling: an integrating perspective, Insertion Algorithms with Justification for Solving the Resource-Constrained Project Scheduling Problem, A note on the paper Resource-constraint project scheduling: Notation, classification, models and methods by Bruckner et al, First Results on Resource-Constrained Project Scheduling with Model-Endogenous Decision on the Project Structure, Re-planning support system for make-to-order production with reserved resources, Polyhedral Reformulation of a Scheduling Problem And Related Theoretical Results, A multi‐agent system for the decentralized resource‐constrained multi‐project scheduling problem, Fuzzy approach for production planning and detailed scheduling in paints manufacturing, Dynamic scheduling for complex engineer-to-order products, Iterative Flattening Search on RCPSP/max Problems: Recent Developments, An iterated-local-search heuristic for the resource-constrained weighted earliness-tardiness project scheduling problem, Hybrid particle swarm and differential evolution algorithm for solving multimode resource-constrained project scheduling problem, Um algoritmo exato para o problema de programação de projetos com custo de disponibilidade de recursos e múltiplos modos, A MULTI-OBJECTIVE RISK-BASED FRAMEWORK FOR MISSION CAPABILITY PLANNING, On some implementations of solving the resource constrained project scheduling problems, On the choice of baseline schedules for the discrete time/resource trade-off problem under stochastic environment, An efficient multi-pass heuristic for project scheduling with constrained resources, A newany-orderschedule generation scheme for resource-constrained project scheduling, Unnamed Item, Scheduling contractors' farm‐to‐farm crop harvesting operations, A multiobjective hybrid ant colony optimization approach applied to the assignment and scheduling problem, A classification scheme for integrated staff rostering and scheduling problems, Environmental regulation in project-based industries, A Theoretical Framework for Instance Complexity of the Resource-Constrained Project Scheduling Problem, Meta-heuristic solution with considering setup time for multi-skilled project scheduling problem, A metaheuristic solution approach for the time-constrained project scheduling problem, Optimising the Slab Yard Planning and Crane Scheduling Problem using a two-stage heuristic, A scatter search heuristic for maximising the net present value of a resource-constrained project with fixed activity cash flows, A heuristic approach for minimizing weighted tardiness and overtime costs in single resource scheduling, A classification of assembly line balancing problems, The impact of solution representations on heuristic net present value optimization in discrete time/cost trade-off project scheduling with multiple cash flow and payment models, The resource-constrained modulo scheduling problem: an experimental study, Measuring flexibility in software project schedules, Managing and modelling general resource transfers in (multi-)project scheduling, Scheduling and staffing multiple projects with a multi-skilled workforce, The sample analysis machine scheduling problem: definition and comparison of exact solving approaches, Complexity of the project scheduling problem with credits, Survey of quantitative methods in construction, Variable neighbourhood search and tabu search for a discrete time/cost trade-off problem to minimize the maximal cash flow gap, Scheduling under the network of temporo-spatial proximity relationships, An exact composite lower bound strategy for the resource-constrained project scheduling problem, On the integration of diverging material flows into resource-constrained project scheduling, Genetic algorithm for the resource-constrained project scheduling problem, A biased random-key genetic algorithm for the project scheduling problem with flexible resources, A polyhedral study of event-based models for the resource-constrained project scheduling problem, Integration of routing into a resource-constrained project scheduling problem, Going to the core of hard resource-constrained project scheduling instances, An analysis of network and resource indicators for resource-constrained project scheduling problem instances, Optimizing the supply chain configuration for make-to-order manufacturing, A linear time-cost tradeoff problem with multiple milestones under a comb graph, Scheduling personnel for the build-up of unit load devices at an air cargo terminal with limited space, A generalized classification scheme for crane scheduling with interference, A Boolean satisfiability approach to the resource-constrained project scheduling problem, Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting, A hybrid metaheuristic for the resource-constrained project scheduling problem, Worst case analysis of decomposed software pipelining for cyclic unitary RCPSP with precedence delays, A fuzzy random resource-constrained scheduling model with~multiple projects and its application to a working procedure in a large-scale water conservancy and hydropower construction project, An improved MIP-based approach for a multi-skill workforce scheduling problem, Solving RCPSP/max by lazy clause generation, Increasing airport capacity utilisation through optimum slot scheduling: review of current developments and identification of future needs, A modified PSO algorithm for minimizing the total costs of resources in MRCPSP, A hybrid multiobjective genetic algorithm for robust resource-constrained project scheduling with stochastic durations, Competence-based estimation of activity duration in IT projects, Multi-objective multi-mode resource constrained project scheduling problem using Pareto-based algorithms, Robust proactive project scheduling model for the stochastic discrete time/cost trade-off problem, Scheduling the two-machine open shop problem under resource constraints for setting the jobs, A hybrid genetic algorithm for the resource-constrained project scheduling problem, Effective neighbourhood functions for the flexible job shop problem, Tabu search for multi-mode resource-constrained project scheduling with schedule-dependent setup times, The bilevel optimisation of a multi-agent project scheduling and staffing problem, A study of the Bienstock-Zuckerberg algorithm: applications in mining and resource constrained project scheduling, Discrete-continuous project scheduling with discounted cash flows - a tabu search approach, A local search framework for industrial test laboratory scheduling, Revenue sharing for resource reallocation among project activity contractors, An updated survey of variants and extensions of the resource-constrained project scheduling problem, Hypernetworks in a directed hypergraph, Resource tardiness weighted cost minimization in project scheduling, Optimizing version release dates of research and development long-term processes, Managing projects with uncertain deadlines, Matching supply and demand in a sharing economy: classification, computational complexity, and application, Metaheuristics for multi-mode capital-constrained project payment scheduling, A market-based multi-agent system model for decentralized multi-project scheduling, A master surgical scheduling approach for cyclic scheduling in operating room departments, Augmenting priority rule heuristics with justification and rollout to solve the resource-constrained project scheduling problem, Skill-based framework for optimal software project selection and resource allocation, An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances, Resource-constrained project scheduling with activity splitting and setup times, A hybrid differential evolution algorithm with column generation for resource constrained job scheduling, Pre-emption in resource-constrained project scheduling, An evolutionary approach to rehabilitation patient scheduling: A case study, An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem, Resource-constrained flowshop scheduling with separate resource recycling operations, An integer programming formulation for the project scheduling problem with irregular time-cost tradeoffs, Dynamic transport scheduling under multiple resource constraints, Generating two-terminal directed acyclic graphs with a given complexity index by constraint logic programming, A branch-and-cut algorithm for scheduling of projects with variable-intensity activities, On scheduling credited projects, Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models, A hybrid framework for over-constrained generalized resource-constrained project scheduling problems, Justification and RCPSP: a technique that pays, Scheduling projects with multi-skilled personnel by a hybrid MILP/CP Benders decomposition algorithm, A learning-based optimization approach to multi-project scheduling, A survey of hybrid metaheuristics for the resource-constrained project scheduling problem, Using schedule risk analysis with resource constraints for project control, Nash equilibrium solutions in multi-agent project scheduling with milestones, Project selection, scheduling and resource allocation with time dependent returns, Markov chain block coordinate descent, Multimode resource-constrained project scheduling in flexible projects, An Optimal Constraint Programming Approach to the Open-Shop Problem, A Dynamic Programming Approach for a Class of Robust Optimization Problems, SAT encodings for pseudo-Boolean constraints together with at-most-one constraints, The Bi-Criterial Approach to Project Cost and Schedule Buffers Sizing, A decomposed branch-and-price procedure for integrating demand planning in personnel staffing problems, Bicriteria train scheduling for high-speed passenger railroad planning applications, Bidirectional planning: Improving priority rule-based heuristics for scheduling resource-constrained projects, Scatter search for project scheduling with resource availability cost, A hybrid scatter search/electromagnetism meta-heuristic for project scheduling, Integrated planning in supply chains with buy-side and sell-side marketplaces, PERT scheduling with convex cost functions., Dominance breaking constraints, Solving the integrated multi-period scheduling routing problem for cleaning debris in the aftermath of disasters, A branch-and-bound procedure for the multi-mode resource-constrained project scheduling problem with minimum and maximum time lags, Genetic algorithm solution for a risk-based partner selection problem in a virtual enterprise, Parallel machine scheduling with additional resources: notation, classification, models and solution methods, An exact algorithm for an integrated project staffing problem with a homogeneous workforce, A classification of predictive-reactive project scheduling procedures, When it is worthwhile to work with the stochastic RCPSP?, Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities, An automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problem, MIP models for resource-constrained project scheduling with flexible resource profiles, A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs, Dynamic resource allocation: a flexible and tractable modeling framework, Complexity results for the linear time-cost tradeoff problem with multiple milestones and completely ordered jobs, An effective branch-and-price algorithm for the preemptive resource constrained project scheduling problem based on minimal interval order enumeration, A continuous time-cost tradeoff problem with multiple milestones and completely ordered jobs, Scheduling resource-constrained projects with a flexible project structure, Bi-objective multi-mode project scheduling under risk aversion, An approach using SAT solvers for the RCPSP with logical constraints, Integration of electromagnetism with multi-objective evolutionary algorithms for RCPSP, Evolutionary multi-objective resource allocation and scheduling in the Chinese navigation satellite system project, Bi-objective resource-constrained project scheduling with robustness and makespan criteria, A survey on single crane scheduling in automated storage/retrieval systems, Parallel ant colony optimization for resource constrained job scheduling, Converging to periodic schedules for cyclic scheduling problems with resources and deadlines, Multi-mode resource-constrained project scheduling problems with non-preemptive activity splitting, Energy-oriented scheduling based on evolutionary algorithms, Solving software project scheduling problems with ant colony optimization, Priority rule-based heuristic for multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting, Modelling and solving generalised operational surgery scheduling problems, A Petri net-based framework for realistic project management and scheduling: an application in animation and videogames, Multiobjective project portfolio selection with fuzzy constraints, A genetic algorithm for resource investment problem with discounted cash flows, Balanced home-away assignments, An optimization model for stochastic project networks with cash flows, Formulating and solving a multi-mode resource-collaboration and constrained scheduling problem (MRCCSP), A genetic algorithm for resource investment project scheduling problem, tardiness permitted with penalty, A branch and bound algorithm for the one-machine scheduling problem with minimum and maximum time lags, Robust optimization models for project scheduling with resource availability cost, A multi-start evolutionary local search for the two-dimensional loading capacitated vehicle routing problem, Scheduling multi-mode projects under uncertainty to optimize cash flows: a Monte Carlo ant colony system approach, Applying local rescheduling in response to schedule disruptions, Project scheduling with finite or infinite number of activity processing modes -- a survey, Resource constraint scheduling with a fractional shared resource, Insertion techniques for static and dynamic resource-constrained project scheduling., Resource-constrained project scheduling: A critical activity reordering heuristic, Lower bounds for resource-constrained project scheduling problems., Order-based neighborhoods for project scheduling with nonregular objective functions., Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem, A branch and cut algorithm for resource-constrained project scheduling problem subject to nonrenewable resources with pre-scheduled procurement, R\&D pipeline management: task interdependencies and risk management, A \((\mu ,\, \lambda )\)-coordination mechanism for agent-based multi-project scheduling, Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers, Robust execution strategies for project scheduling with unreliable resources and stochastic durations, Tight complexity analysis of the relocation problem with arbitrary release dates, Production scheduling with alternative process plans, Project scheduling with flexible resources: formulation and inequalities, Memetic algorithm timetabling for non-commercial sport leagues., Computing a lower approximation of the compulsory part of a task with varying duration and varying resource consumption., Time slack-based techniques for robust project scheduling subject to resource uncertainty, A min-flow algorithm for minimal critical set detection in resource constrained project scheduling, Solving the resource-constrained project scheduling problem by a variable neighbourhood search., Using a risk-based approach to project scheduling: a case illustration from semiconductor manufacturing, Branch-and-price approach for the multi-skill project scheduling problem, A constraint programming approach for the resource-constrained project scheduling problem, A fuzzy time-dependent project scheduling problem, A new approach for solving the network problems, A random key based genetic algorithm for the resource constrained project scheduling problem, Handling precedence constraints in scheduling problems by the sequence pair representation, Improving simulated annealing with variable neighborhood search to solve the resource-constrained scheduling problem, Analysis, modeling and solution of the concrete delivery problem, Minimizing the total weighted completion time in the relocation problem, Project scheduling heuristics-based standard PSO for task-resource assignment in heterogeneous grid, The project scheduling problem with production and consumption of resources: a list-scheduling based algorithm, Scheduling and constraint propagation, An exact algorithm for minimizing resource availability costs in project scheduling, Project scheduling with irregular costs: complexity, approximability, and algorithms, A double genetic algorithm for the MRCPSP/max, A neurogenetic approach for the resource-constrained project scheduling problem, Theoretical and practical fundamentals for multi-objective optimisation in resource-constrained project scheduling problems, An efficient heuristic for adaptive production scheduling and control in one-of-a-kind production, Theoretical aspects of multicriteria flight gate scheduling: Deterministic and fuzzy models, Robust resource allocations in temporal networks, A decomposition-based stochastic programming approach for the project scheduling problem under time/cost trade-off settings and uncertain durations, A model, heuristic procedure and decision support system for solving the movie shoot scheduling problem, A survey of variants and extensions of the resource-constrained project scheduling problem, Analysis of the similarities and differences of job-based scheduling problems, Efficient priority rules for the stochastic resource-constrained project scheduling problem, Maximising the weighted number of activity execution modes in project planning, A new path-based cutting plane approach for the discrete time-cost tradeoff problem, Sequencing mixed-model assembly lines: survey, classification and model critique, Simulated annealing for financing cost distribution based project payment scheduling from a joint perspective, Railway scheduling reduces the expected project makespan over roadrunner scheduling in a multi-mode project scheduling environment, Discrete-continuous project scheduling with discounted cash inflows and various payment models -- a review of recent results, Resilience analysis for project scheduling with renewable resource constraint and uncertain activity durations, A heuristic solution framework for the resource constrained (multi-)project scheduling problem with sequence-dependent transfer times, A framework for collaborative planning and state-of-the-art, A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem, Maximizing the net present value of a project under uncertainty, A tabu search algorithm for scheduling pharmaceutical packaging operations, Activity list representation for a generalization of the resource-constrained project scheduling problem, Scheduling non-professional table-tennis leagues, On the use of genetic programming to evolve priority rules for resource constrained project scheduling problems, A priority-rule method for project scheduling with work-content constraints, Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
Uses Software
Cites Work
- New Benchmark Results for the Resource-Constrained Project Scheduling Problem
- A constraint-based perspective in resource constrained project scheduling
- Project scheduling with multiple modes: A comparison of exact algorithms
- A new approach to computing optimal schedules for the job-shop scheduling problem
- Preselective strategies for the optimization of stochastic project networks under resource constraints
- Algorithmic approaches to preselective strategies for stochastic scheduling problems
- Constraint Propagation Based Scheduling of Job Shops
- Expected Critical Path Lengths in PERT Networks
- On the Expected Duration of PERT Type Networks
- Cash Flows in Networks
- An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints
- Conditional Monte Carlo: A Simulation Technique for Stochastic Network Analysis
- Optimal design of centralized computer networks
- Bounding Distributions for a Stochastic Acyclic Network
- The payment scheduling problem
- Adaptive search for solving hard project scheduling problems
- Minimizing Resource Availability Costs in Time-Limited Project Networks
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- Project scheduling with multiple modes: A genetic algorithm
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Some efficient multi-heuristic procedures for resource-constrained project scheduling
- The scheduling of activities to maximize the net present value of projects
- Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems
- Distribution-free bounds on the expectation of the maximum with scheduling applications
- The use of cutsets in Monte Carlo analysis of stochastic networks
- A practical use of Jackson's preemptive schedule for solving the job shop problem
- Scheduling subject to resource constraints: Classification and complexity
- A comparison of stochastic scheduling rules for maximizing project net present value
- The discrete time-cost tradeoff problem revisited
- The one-machine sequencing problem
- Consistency in networks of relations
- A computational study of constraint satisfaction for multiple capacitated job shop scheduling
- A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes
- Optimal procedures for the discrete time/cost trade-off problem in project networks
- The job shop scheduling problem: Conventional and new solution techniques
- Project network models with discounted cash flows a guided tour through recent developments
- PSPLIB -- a project scheduling problem library
- Project scheduling under resource and mode identity constraints: Model, complexity, methods, and application
- A branch and bound algorithm for the resource-constrained project scheduling problem
- Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm
- A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations
- A comparative study of computational procedures for the resource constrained project scheduling problem
- A branch and bound algorithm for the job-shop scheduling problem
- Resource-constrained project scheduling. Exact methods for the multi-mode case
- Heuristics for scheduling resource-constrained projects in MPM networks
- The job-shop problem and immediate selection
- Optimal resource leveling using non-serial dynamic programming
- DSS for multiobjective project scheduling
- A local constraint based analysis approach to project scheduling under general resource constraints
- An exact algorithm for project scheduling with multiple modes
- Activity-on-node networks with minimal and maximal time lags and their application to make-to-order production
- Branch and bound methods for scheduling problems with multiprocessor tasks on dedicated processors
- Constraint-based job shop scheduling with Ilog Scheduler
- Activity nets: A guided tour through some recent developments
- Constraint-based scheduling: Applying constraint programming to scheduling problems.
- A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version.
- Lower bounds for resource-constrained project scheduling problems.
- Stochastic gradient-based time-cost tradeoffs in PERT networks using simulation
- Computing lower bounds by destructive improvement: An application to resource-constrained project scheduling
- Resource levelling for projects with schedule-dependent time windows
- The multi-mode resource-constrained project scheduling problem with generalized precedence relations
- Experience with fine-grained parallel genetic algorithms
- Project scheduling with resource constraints: A branch and bound approach. Note by Frederik Kaefer
- Networks of constraints: Fundamental properties and applications to picture processing
- Strength and adaptability of problem-space based neighborhoods for resource-constrained scheduling
- Satisfiability tests and time-bound adjustments for cumulative scheduling problems
- Solving various weighted matching problems with constraints
- A new lower bound for the job-shop scheduling problem
- PERT and crashing revisited: Mathematical generalizations
- Risk taking in stochastic PERT networks
- Allocation of partially renewable resources: Concept, capabilities, and applications
- A Network Flow Computation for Project Cost Curves
- An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation
- Computing the probability distribution of project duration in a PERT network
- The Complexity of Counting Cuts and of Computing the Probability that a Graph is Connected
- A Time-Oriented Branch-and-Bound Algorithm for Resource-Constrained Project Scheduling with Generalised Precedence Constraints
- Project Contracts and Payment Schedules: The Client's Problem
- Project Scheduling Under Partially Renewable Resource Constraints
- Convex majorization with an application to the length of critical paths
- Stochastic scheduling problems I — General strategies
- Critical-Path Planning and Scheduling: Mathematical Basis
- Minimizing Costs of Resource Requirements in Project Networks Subject to a Fixed Completion Time
- Scheduling of Project Networks by Job Assignment
- Stochastic scheduling problems II-set strategies-
- Bounding the Project Completion Time Distribution in PERT Networks
- Robustness against dependence in PERT: An application of duality and distributions with known marginals
- Stochastic Bounds on Distributions of Optimal Value Functions with Applications to PERT, Network Flows and Reliability
- A sufficient condition for backtrack-bounded search
- A new approach to the maximum-flow problem
- An Algorithm for Solving the Job-Shop Problem
- The Cut Search Algorithm with Arc Capacities and Lower Bounds
- Inequalities for the Completion Times of Stochastic PERT Networks
- A Sufficient Condition for Backtrack-Free Search
- Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
- Optimal Reduction of Two-Terminal Directed Acyclic Graphs
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
- A Dynamic Programming Solution to Cost-Time Tradeoff for CPM
- Technical Note—Expected Completion Time in Pert Networks
- Project scheduling: The effects of problem structure on heuristic performance
- Bounding distributions for a stochastic pert network
- Solving the Project Time/Cost Tradeoff Problem Using the Minimal Cut Concept
- An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems
- A Dynamic Programming Algorithm for Decision CPM Networks
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- Local search methods for the discrete time/resource trade-off problem in project networks
- The Most Critical Path in a PERT Network
- A Branch and Bound Procedure for the Resource Constrained Project Scheduling Problem with Discounted Cash Flows
- Complexity of the Discrete Time-Cost Tradeoff Problem for Project Networks
- Heuristic scheduling of resource-constrained projects with cash flows