Hierarchical production control for a flow shop with dynamic setup changes and random machine breakdowns
From MaRDI portal
Publication:1814871
DOI10.1007/BF01539732zbMath0858.90065MaRDI QIDQ1814871
Publication date: 31 October 1996
Published in: OR Spektrum (Search for Journal in Brave)
dynamic programmingproduction schedulingmanufacturing systemfailurerepairtwo machinesintermediate buffershierarchical control structuretime-to-repairdynamic setup changeoptimal control policy structurestochastic flow-shoptime-to-failure
Deterministic scheduling theory in operations research (90B35) Reliability, availability, maintenance, inspection in operations research (90B25) Production models (90B30)
Related Items (2)
Production and set-up control of a failure-prone manufacturing system ⋮ Optimal production and setup control of a dynamic two-product manufacturing system: Analytical solution
Cites Work
- Unnamed Item
- The discrete lot-sizing and scheduling problem
- Dynamic setup scheduling and flow control in manufacturing systems
- Optimal control of production rate in a failure prone manufacturing system
- Dynamic Programming and Minimum Principles for Systems with Jump Markov Disturbances
- Scheduling manufacturing systems with work-in-process inventory control: multiple-part-type systems
This page was built for publication: Hierarchical production control for a flow shop with dynamic setup changes and random machine breakdowns