An heuristic algorithm for a multi-product, single machine capacitated production scheduling problem
From MaRDI portal
Publication:1818572
DOI10.1016/S0305-0548(99)00035-0zbMath0999.90015OpenAlexW1974076864MaRDI QIDQ1818572
R. Michael Harnett, James Boyd Bankston
Publication date: 30 November 2002
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0305-0548(99)00035-0
Approximation methods and heuristics in mathematical programming (90C59) Production models (90B30) Case-oriented studies in operations research (90B90)
Related Items (1)
This page was built for publication: An heuristic algorithm for a multi-product, single machine capacitated production scheduling problem