Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

A new branch-and-bound approach for the \(n/2\)/flowshop/\(\alpha F+\beta C_{\text{max}}\) flowshop scheduling problem

From MaRDI portal
Publication:1819236
Jump to:navigation, search

DOI10.1016/S0305-0548(98)00106-3zbMath0967.90052MaRDI QIDQ1819236

Yeh, Wei-Chang

Publication date: 3 September 2001

Published in: Computers \& Operations Research (Search for Journal in Brave)


zbMATH Keywords

computational analysis


Mathematics Subject Classification ID

Polyhedral combinatorics, branch-and-bound, branch-and-cut (90C57) Deterministic scheduling theory in operations research (90B35)


Related Items

A branch-and-bound algorithm for the three-machine flowshop scheduling problem with bicriteria of makespan andtotal flowtime, No-wait flowshops with bicriteria of makespan and maximum lateness., A bicriteria flowshop scheduling with a learning effect, A bicriteria \(m\)-machine flowshop scheduling with sequence-dependent setup times, Counting and enumeration complexity with application to multicriteria scheduling, A branch-and-bound algorithm for three-machine flowshop scheduling problem to minimize total completion time with separate setup times, An ant colony optimization algorithm to solve a 2-machine bicriteria flowshop scheduling problem, The two- and \(m\)-machine flowshop scheduling problems with bicriteria of makespan and mean flowtime



Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:1819236&oldid=14179883"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 1 February 2024, at 10:40.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki