Optimal resource profiles for program scheduling
From MaRDI portal
Publication:1821025
DOI10.1016/0377-2217(87)90196-2zbMath0615.90069OpenAlexW2111700474MaRDI QIDQ1821025
Publication date: 1987
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(87)90196-2
Related Items
Early-tardy cost trade-offs in resource constrained projects with cash flows: An optimization-guided heuristic approach ⋮ Hierarchical models for multi-project planning and scheduling ⋮ Optimal resource leveling using non-serial dynamic programming ⋮ A stochastic model to control project duration and expenditure ⋮ Constrained multi-project planning problems: A Lagrangean decomposition approach ⋮ Multi-objective time-cost trade-off in dynamic PERT networks using an interactive approach ⋮ A multi-objective resource allocation problem in dynamic PERT networks ⋮ Time-cost trade-off via optimal control theory in Markov PERT networks ⋮ A multi-objective resource allocation problem in PERT networks ⋮ The scheduling of activities to maximize the net present value of projects ⋮ A multi-stage non-deterministic model for project scheduling under resources constraints ⋮ A review of the contribution of operational research to project management ⋮ A genetic algorithm approach for the time-cost trade-off in PERT networks ⋮ Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints
Cites Work
- Optimal control policies for resource allocation in an activity network
- Preemptive scheduling of independent jobs on parallel machines subject to financial constraints
- ON CERTAIN MODELS OF RESOURCE ALLOCATION PROBLEMS
- Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
- Time-Optimal Control of Resource Allocation in a Complex of Operations Framework
- A Variational Study of Optimal Resource Profiles
- Unnamed Item
- Unnamed Item
- Unnamed Item