Stochastic and fuzzy PERT
From MaRDI portal
Publication:1823843
DOI10.1016/0377-2217(89)90211-7zbMath0681.90039OpenAlexW2254188856MaRDI QIDQ1823843
Publication date: 1989
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(89)90211-7
membership functionsfuzzy modelsrandomnessvaguenesstriangulargamma distributionsmaxima of fuzzy numbersminimum project durationNetwork- planningstochastic versions of PERT
Deterministic scheduling theory in operations research (90B35) Theory of fuzzy sets, etc. (03E72) Traffic problems in operations research (90B20)
Related Items
A fuzzy robust scheduling approach for product development projects. ⋮ Modeling uncertain activity duration by fuzzy number and discrete-event simulation ⋮ A path enumeration approach for the analysis of critical activities in fuzzy networks ⋮ Critical path analysis in the network with fuzzy activity times ⋮ On the latest starting times and criticality of activities in a network with imprecise durations ⋮ The computational complexity of the criticality problems in a network with interval activity times ⋮ Computing latest starting times of activities in interval-valued networks with minimal time lags ⋮ Using stochastic decision networks to assess costs and completion times of refurbishment work in construction ⋮ Computing improved optimal solutions to max-min flexible constraint satisfaction problems ⋮ A fuzzy project scheduling approach to minimize schedule risk for product development ⋮ Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge ⋮ On latest starting times and floats in activity networks with ill-known durations
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- A fuzzy extension of Saaty's priority theory
- The use of fuzzy variables in PERT
- Modélisation du jugement humain dans l'analyse multicritère au moyen de comparaisons par paires
- Convex majorization with an application to the length of critical paths
- Robustness against dependence in PERT: An application of duality and distributions with known marginals
- The Completion Time of PERT Networks
- Bounding distributions for a stochastic pert network
- Algorithmes de plus courts chemins pour traiter des données floues
- Operations on fuzzy numbers
- Project scheduling via stochastic programming
- Application of a Technique for Research and Development Program Evaluation
- Expected Critical Path Lengths in PERT Networks
- Distribution of the Time Through a Directed, Acyclic Network
- A Statistical Theory for PERT Critical Path Analysis
- Fuzzy sets
- Network planning with stochastic activity durations, an evaluation of PERT
- On the Expected Duration of PERT Type Networks
- The Greatest of a Finite Set of Random Variables
- The Theory of Networks and Management Science. Part I
- Conditional Monte Carlo: A Simulation Technique for Stochastic Network Analysis
- Bounding Distributions for a Stochastic Acyclic Network