Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

An exact optimal cyclic scheduling algorithm for multioperator service of a production line

From MaRDI portal
Publication:1835841
Jump to:navigation, search

zbMath0504.90042MaRDI QIDQ1835841

V. B. Kats

Publication date: 1982

Published in: Automation and Remote Control (Search for Journal in Brave)


zbMATH Keywords

exact branch-and-bound algorithmexact optimal cyclic scheduling algorithmmanufacturing of identical productsminimal length schedule algorithmmultioperator service


Mathematics Subject Classification ID

Analysis of algorithms and problem complexity (68Q25) Deterministic scheduling theory in operations research (90B35)


Related Items (7)

Cyclic multiple-robot scheduling with time-window constraints using a critical path approach ⋮ Multi-degree cyclic flow shop robotic cell scheduling problem: ant colony optimization ⋮ A strongly polynomial algorithm for no-wait cyclic robotic flowshop scheduling ⋮ Sequencing and scheduling in robotic cells: recent developments ⋮ A parametric critical path problem and an application for cyclic scheduling ⋮ An improved algorithm for cyclic flowshop scheduling in a robotic cell ⋮ Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robots




This page was built for publication: An exact optimal cyclic scheduling algorithm for multioperator service of a production line

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:1835841&oldid=14212517"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 1 February 2024, at 10:27.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki