On a periodic maintenance problem
From MaRDI portal
Publication:1837102
DOI10.1016/0167-6377(83)90044-5zbMath0506.90032OpenAlexW2095130077MaRDI QIDQ1837102
Publication date: 1983
Published in: Operations Research Letters (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0167-6377(83)90044-5
Related Items
Schedulers for larger classes of pinwheel instances ⋮ Balancing perfectly periodic service schedules: An application from recycling and waste management ⋮ Adaptive general perfectly periodic scheduling ⋮ The use and usefulness of numeration systems ⋮ The scheduling of maintenance service ⋮ Using aggregation to reduce response time variability in cyclic fair sequences ⋮ Windows scheduling of arbitrary-length jobs on multiple machines ⋮ A branch and bound algorithm for the response time variability problem ⋮ Pinwheel scheduling with two distinct numbers ⋮ Iterated Floor Function, Algebraic Numbers, Discrete Chaos, Beatty Subsequences, Semigroups ⋮ Hyper-heuristic approaches for the response time variability problem ⋮ On indexed data broadcast ⋮ Mathematical programming modeling of the response time variability problem ⋮ Time-indexed formulations for scheduling chains on a single machine: an application to airborne radars
Cites Work
This page was built for publication: On a periodic maintenance problem