Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

A note on minimum makespan assembly plans

From MaRDI portal
Publication:1848367
Jump to:navigation, search

DOI10.1016/S0377-2217(01)00295-8zbMath1082.90524OpenAlexW2019071454MaRDI QIDQ1848367

Giorgio Gallo, Maria Grazia Scutellà

Publication date: 20 November 2002

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/s0377-2217(01)00295-8


zbMATH Keywords

HeuristicsManufacturingSchedulingAssembling


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)


Related Items (3)

Flow hypergraph reducibility ⋮ Minimal functional routes in directed graphs with dependent edges ⋮ Finding hypernetworks in directed hypergraphs



Cites Work

  • Scheduling tree-structured tasks with restricted execution times
  • Flows on hypergraphs
  • Directed hypergraphs and applications
  • `` Strong NP-Completeness Results
  • Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey


This page was built for publication: A note on minimum makespan assembly plans

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:1848367&oldid=14229878"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 1 February 2024, at 11:58.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki