A production planning model for an unreliable production facility: case of finite horizon and single demand
From MaRDI portal
Publication:1848632
DOI10.1016/S0377-2217(01)00326-5zbMath1073.90500OpenAlexW3124395777MaRDI QIDQ1848632
Publication date: 13 November 2002
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0377-2217(01)00326-5
Related Items (1)
Cites Work
- Unnamed Item
- Unnamed Item
- Production scheduling and sequencing for multi-stage production systems
- Dynamic Version of the Economic Lot Size Model
- Computationally Efficient Optimal Solutions to the Lot-Sizing Problem in Multistage Assembly Systems
- The Deterministic Dynamic Product Cycling Problem
- Optimal Inventory Policies for Assembly Systems Under Random Demands
- An Algorithm for the Dynamic Lot-Size Problem with Time-Varying Production Capacity Constraints
- Deterministic Production Planning with Concave Costs and Capacity Constraints
- A Backlogging Model and a Multi-Echelon Model of a Dynamic Economic Lot Size Production System—A Network Approach
This page was built for publication: A production planning model for an unreliable production facility: case of finite horizon and single demand