Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line
From MaRDI portal
Publication:1848633
DOI10.1016/S0377-2217(01)00328-9zbMath1073.90514MaRDI QIDQ1848633
Publication date: 13 November 2002
Published in: European Journal of Operational Research (Search for Journal in Brave)
Related Items (21)
Hierarchical approach to production scheduling in make-to-order assembly ⋮ Simultaneous Balancing and Scheduling of Flexible Mixed Model Assembly Lines with Sequence-Dependent Setup Times ⋮ Balancing mixed-model assembly lines: a computational evaluation of objectives to smoothen workload ⋮ A classification of assembly line balancing problems ⋮ A versatile algorithm for assembly line balancing ⋮ Formulating and solving a multi-mode resource-collaboration and constrained scheduling problem (MRCCSP) ⋮ A weighted multiobjective optimization method for mixed-model assembly line problem ⋮ New mathematical and constraint programming models for U-type assembly line balancing problems with assignment restrictions ⋮ Mixed model line balancing with parallel stations, zoning constraints, and ergonomics ⋮ Loading and scheduling of a flexible assembly system by mixed integer programming. ⋮ Balancing and scheduling of flexible mixed model assembly lines ⋮ Optimization framework for process scheduling of operation-dependent automobile assembly lines ⋮ A cutting plane approach for integrated planning and scheduling ⋮ Integer programming approach to production scheduling for make-to-order manufacturing ⋮ An evaluation of constructive heuristic methods for solving the alternative subgraphs assembly line balancing problem ⋮ Monolithic versus hierarchical approach to integrated scheduling in a supply chain ⋮ A simheuristic approach for throughput maximization of asynchronous buffered stochastic mixed-model assembly lines ⋮ Sequencing mixed-model assembly lines: survey, classification and model critique ⋮ Integrated planning for product module selection and assembly line design/reconfiguration ⋮ Supply chain scheduling in a collaborative manufacturing mode: model construction and algorithm design ⋮ \texttt{Absalom}: balancing assembly lines with assignment restrictions
Cites Work
- Unnamed Item
- Unnamed Item
- A mixed integer program for loading and scheduling multiple flexible manufacturing cells
- A lexicographic approach to bi-objective loading of a flexible assembly system
- Mixed integer programming for scheduling flexible flow lines with limited intermediate buffers
- Maximizing Submodular Set Functions: Formulations and Analysis of Algorithms
- Simultaneous versus sequential loading and scheduling of flexible assembly systems
- Mixed integer programming for scheduling surface mount technology lines
This page was built for publication: Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line