Pareto-optimality approach for flexible job-shop scheduling problems: Hybridization of evolutionary algorithms and fuzzy logic
From MaRDI portal
Publication:1849826
DOI10.1016/S0378-4754(02)00019-8zbMath1006.90044MaRDI QIDQ1849826
Pierre Borne, Slim Hammadi, Imed Kacem
Publication date: 2 December 2002
Published in: Mathematics and Computers in Simulation (Search for Journal in Brave)
fuzzy logicmulti-objective optimizationPareto-optimalityapproach by localizationcontrolled evolutionary algorithmsflexible job-shop scheduling problem
Multi-objective and goal programming (90C29) Fuzzy logic; logic of vagueness (03B52) Deterministic scheduling theory in operations research (90B35)
Related Items (46)
A priority-based genetic algorithm for a flexible job shop scheduling problem ⋮ A variable neighbourhood search algorithm for the flexible job-shop scheduling problem ⋮ A multi-criteria approach for scheduling semiconductor wafer fabrication facilities ⋮ Dispatching algorithm for production programming of flexible job-shop systems in the smart factory industry ⋮ List scheduling and beam search methods for the flexible job shop scheduling problem with sequencing flexibility ⋮ A neighborhood search function for flexible job shop scheduling with separable sequence-dependent setup times ⋮ A simulated multi-objective model for flexible job shop transportation scheduling ⋮ Path-relinking tabu search for the multi-objective flexible job shop scheduling problem ⋮ Genetic tabu search for the fuzzy flexible job shop problem ⋮ An effective architecture for learning and evolving flexible job-shop schedules ⋮ A multi objective optimization approach for flexible job shop scheduling problem under random machine breakdown by evolutionary algorithms ⋮ A multi-objective production scheduling case study solved by simulated annealing ⋮ Pareto-ranking based quantum-behaved particle swarm optimization for multiobjective optimization ⋮ A hybrid genetic-particle swarm algorithm based on multilevel neighbourhood structure for flexible job shop scheduling problem ⋮ Metaheuristics for the multi-objective FJSP with sequence-dependent set-up times, auxiliary resources and machine down time ⋮ A filtered-beam-search-based heuristic algorithm for flexible job-shop scheduling problem ⋮ A multi-agent system for integrated scheduling and maintenance planning of the flexible job shop ⋮ Differential evolution algorithm with dynamic multi-population applied to flexible job shop schedule ⋮ A decomposition-based artificial bee colony algorithm for the multi-objective flexible jobshop scheduling problem ⋮ Multi-population interactive coevolutionary algorithm for flexible job shop scheduling problems ⋮ A tabu search and a genetic algorithm for solving a bicriteria general job shop scheduling problem ⋮ Logic-based Benders decomposition for the preemptive flexible job-shop scheduling problem ⋮ Mixed integer goal programming models for the flexible job-shop scheduling problems with separable and non-separable sequence dependent setup times ⋮ Simulated-annealing-based hyper-heuristic for flexible job-shop scheduling ⋮ An effective shuffled frog-leaping algorithm for multi-objective flexible job shop scheduling problems ⋮ A hybrid multiobjective evolutionary approach for flexible job-shop scheduling problems ⋮ Introduction to Invasive Weed Optimization Method ⋮ Choquet integral for criteria aggregation in the flexible job-shop scheduling problems ⋮ Pareto-based grouping discrete harmony search algorithm for multi-objective flexible job shop scheduling ⋮ A discrete artificial bee colony algorithm for the multi-objective flexible job-shop scheduling problem with maintenance activities ⋮ A novel memetic algorithm based on decomposition for multiobjective flexible job shop scheduling problem ⋮ A new energy-aware flexible job shop scheduling method using modified biogeography-based optimization ⋮ A hybrid genetic and variable neighborhood descent algorithm for flexible job shop scheduling problems ⋮ Flexible job shop scheduling with overlapping in operations ⋮ A self-guided genetic algorithm for permutation flowshop scheduling problems ⋮ A genetic algorithm with tabu search procedure for flexible job shop scheduling with transportation constraints and bounded processing times ⋮ Mathematical models for job-shop scheduling problems with routing and process plan flexibility ⋮ Multi-objective optimisation in flexible assembly job shop scheduling using a distributed ant colony system ⋮ Survey on fuzzy shop scheduling ⋮ Double layer ACO algorithm for the multi-objective FJSSP ⋮ A research survey: review of flexible job shop scheduling techniques ⋮ A discrete firefly algorithm for solving the flexible job-shop scheduling problem in a make-to-order manufacturing system ⋮ Flexible job-shop scheduling problem under resource constraints ⋮ Logic optimality for multi-objective optimization ⋮ Pareto-optimality approach for flexible job-shop scheduling problems: Hybridization of evolutionary algorithms and fuzzy logic ⋮ Pareto-optimal Algorithms for Scheduling Games on Parallel-batching Machines with Activation Cost
Uses Software
Cites Work
This page was built for publication: Pareto-optimality approach for flexible job-shop scheduling problems: Hybridization of evolutionary algorithms and fuzzy logic