Advanced production scheduling for batch plants in process industries
From MaRDI portal
Publication:1850300
DOI10.1007/s00291-002-0100-8zbMath1007.90505OpenAlexW2027051407MaRDI QIDQ1850300
Christoph Schwindt, Klaus Neumann, Norbert Trautmann
Publication date: 3 December 2002
Published in: OR Spectrum (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s00291-002-0100-8
Related Items (10)
Scheduling the production of rolling ingots: industrial context, model, and solution method ⋮ Multilevel capacitated lot-sizing and resource-constrained project scheduling: an integrating perspective ⋮ The job shop scheduling problem with convex costs ⋮ GRASP and path relinking for project scheduling under partially renewable resources ⋮ A scatter search algorithm for project scheduling under partially renewable resources ⋮ A cyclic approach to large-scale short-term planning in chemical batch production ⋮ A complex time based construction heuristic for batch scheduling problems in the chemical industry ⋮ An iterated-local-search heuristic for the resource-constrained weighted earliness-tardiness project scheduling problem ⋮ Value chain management for commodities: a case study from the chemical industry ⋮ MILP-based campaign scheduling in a specialty chemicals plant: a case study
This page was built for publication: Advanced production scheduling for batch plants in process industries