Planning and scheduling in the process industry

From MaRDI portal
Publication:1850307

DOI10.1007/s00291-002-0101-7zbMath1007.90506OpenAlexW2077003519MaRDI QIDQ1850307

Josef Kallrath

Publication date: 3 December 2002

Published in: OR Spectrum (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1007/s00291-002-0101-7




Related Items (18)

Energy-efficient scheduling in manufacturing companies: a review and research frameworkA hybrid policy for order acceptance in batch process industriesA sustainable aggregate production planning model for the chemical process industryOn the integration of diverging material flows into resource-constrained project schedulingMathematical model for scheduling operations in cascaded continuous processing unitsAn MILP model for planning of batch plants operating in a campaign-modeDiscrete and continuous time representations and mathematical models for large production scheduling problems: a case study from the pharmaceutical industryModeling industrial lot sizing problems: a reviewClassifying and modeling setups and cleanings in lot sizing and schedulingCampaign planning in time-indexed model formulationsA cyclic approach to large-scale short-term planning in chemical batch productionFuzzy approach for production planning and detailed scheduling in paints manufacturingA complex time based construction heuristic for batch scheduling problems in the chemical industryOptimal sizing, scheduling and shift policy of the grinding section of a ceramic tile plantAdjustable robust optimization for multi-tasking scheduling with reprocessing due to imperfect tasksValue chain management for commodities: a case study from the chemical industryChallenges in Enterprise Wide Optimization for the Process IndustriesA hybrid method for large-scale short-term scheduling of make-and-pack production processes







This page was built for publication: Planning and scheduling in the process industry