Effective heuristic procedures for a field technician scheduling problem
From MaRDI portal
Publication:1850973
DOI10.1023/A:1011377929184zbMath1013.90061OpenAlexW1497691682MaRDI QIDQ1850973
Publication date: 15 December 2002
Published in: Journal of Heuristics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1023/a:1011377929184
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (24)
Mixed integer linear programming for a multi-attribute technician routing and scheduling problem ⋮ Branch-and-price and constraint programming for solving a real-life technician dispatching problem ⋮ An efficient optimisation procedure for the workforce scheduling and routing problem: Lagrangian relaxation and iterated local search ⋮ Multi-period technician scheduling with experience-based service times and stochastic customers ⋮ Solving technician routing and scheduling problem using improved particle swarm optimization ⋮ A biased random key genetic algorithm for the field Technician scheduling problem ⋮ Optimization of the technician routing and scheduling problem for a telecommunication industry ⋮ A parallel matheuristic for the technician routing and scheduling problem ⋮ Dynamic dispatching and repositioning policies for fast-response service networks ⋮ An integrated solution approach for multi-objective, multi-skill workforce scheduling and routing problems ⋮ Multiperiod integrated spare parts and tour planning for on-site maintenance activities with stochastic repair requests ⋮ Enhanced iterated local search for the technician routing and scheduling problem ⋮ Algorithms for the multiperiod workforce scheduling and routing problem with dependent tasks ⋮ Exact and hyper‐heuristic solutions for the distribution‐installation problem from the VeRoLog 2019 challenge ⋮ Resource constrained routing and scheduling: review and research prospects ⋮ An Investigation of Heuristic Decomposition to Tackle Workforce Scheduling and Routing with Time-Dependent Activities Constraints ⋮ Branch-and-price for a multi-attribute technician routing and scheduling problem ⋮ Branch-and-price approaches for the multiperiod technician routing and scheduling problem ⋮ A GRASP-based approach for technicians and interventions scheduling for telecommunications ⋮ Scheduling technicians and tasks in a telecommunications company ⋮ Accounting for cost heterogeneity on the demand in the context of a technician dispatching problem ⋮ Branch and price for the vehicle routing problem with discrete Split deliveries and time windows ⋮ Un algorithme GRASP pour le problème de planification de techniciens et d'interventions pour les télécommunications ⋮ Time window optimization for attended home service delivery under multiple sources of uncertainties
This page was built for publication: Effective heuristic procedures for a field technician scheduling problem