Lower bounds on precedence-constrained scheduling for parallel processors.
From MaRDI portal
Publication:1853033
DOI10.1016/S0020-0190(01)00303-9zbMath1043.68029OpenAlexW1998723022MaRDI QIDQ1853033
Alexandre Eichenberger, Ivan D. Baev, Waleed M. Meleis
Publication date: 21 January 2003
Published in: Information Processing Letters (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0020-0190(01)00303-9
Cites Work
- Unnamed Item
- NP-complete scheduling problems
- Optimal scheduling for two-processor systems
- Multiprocessor Scheduling of Unit-Time Jobs with Arbitrary Release Times and Deadlines
- Scheduling Equal-Length Tasks Under Treelike Precedence Constraints to Minimize Maximum Lateness
- Scheduling to Minimize Average Completion Time: Off-Line and On-Line Approximation Algorithms
- Scheduling independent tasks to reduce mean finishing time
This page was built for publication: Lower bounds on precedence-constrained scheduling for parallel processors.