Recent results on resource-constrained project scheduling with time windows: Models, solution methods, and applications

From MaRDI portal
Publication:1854657
Jump to:navigation, search

zbMath1017.90041MaRDI QIDQ1854657

Christoph Schwindt, Klaus Neumann, Jürgen Zimmermann

Publication date: 10 April 2003

Published in: CEJOR. Central European Journal of Operations Research (Search for Journal in Brave)


zbMATH Keywords

heuristicsapplicationsresource-constrained project schedulingexact algorithmsregular and nonregular objective functions


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)


Related Items

A metaheuristic solution approach for the time-constrained project scheduling problem ⋮ Time-constrained project scheduling ⋮ A branch and bound algorithm for the one-machine scheduling problem with minimum and maximum time lags ⋮ Scheduling tests in automotive R\&D projects ⋮ A survey of variants and extensions of the resource-constrained project scheduling problem ⋮ Minimizing total weighted late work in the resource-constrained project scheduling problem ⋮ Optimization of a recursive conveyor by reduction to a constraint satisfaction problem



Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:1854657&oldid=14238763"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 1 February 2024, at 12:12.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki