On two single machine scheduling problems with fuzzy processing times and fuzzy due dates
From MaRDI portal
Publication:1869711
DOI10.1016/S0377-2217(02)00561-1zbMath1037.90025MaRDI QIDQ1869711
Publication date: 28 April 2003
Published in: European Journal of Operational Research (Search for Journal in Brave)
Deterministic scheduling theory in operations research (90B35) Fuzzy and other nonstochastic uncertainty mathematical programming (90C70)
Related Items (8)
SOME GENERAL PROPERTIES OF A FUZZY SINGLE MACHINE SCHEDULING PROBLEM ⋮ Minimizing maximum cost for a single machine under uncertainty of processing times ⋮ USING GENETIC ALGORITHMS TO SOLVE FUZZY FLOW SHOP SCHEDULING PROBLEMS BASED ON POSSIBILITY AND NECESSITY MEASURES ⋮ Fuzzy scheduling of job orders in a two-stage flowshop with batch-processing machines ⋮ Fuzzy approach for production planning and detailed scheduling in paints manufacturing ⋮ Bi-objective cell loading problem with non-zero setup times with fuzzy aspiration levels in labour intensive manufacturing cells ⋮ Survey on fuzzy shop scheduling ⋮ USING ANT COLONY OPTIMIZATION TO MINIMIZE THE FUZZY MAKESPAN AND TOTAL WEIGHTED FUZZY COMPLETION TIME IN FLOW SHOP SCHEDULING PROBLEMS
Cites Work
- Unnamed Item
- Ranking fuzzy numbers with integral value.
- Single value simulation of fuzzy variable
- The mean value of a fuzzy number
- Optimal fuzzy counterparts of scheduling rules
- A procedure for ordering fuzzy subsets of the unit interval
- The expected value of a fuzzy number
- Fuzzy sets as a basis for a theory of possibility
- The concept of a linguistic variable and its application to approximate reasoning. I
- One machine scheduling problem with fuzzy duedates
- Single machine, scheduling problem with fuzzy precedence relation
- Operations on fuzzy numbers
- Optimal Sequencing of a Single Machine Subject to Precedence Constraints
This page was built for publication: On two single machine scheduling problems with fuzzy processing times and fuzzy due dates