Scheduling parallel dedicated machines under a single non-shared resource

From MaRDI portal
Publication:1869718

DOI10.1016/S0377-2217(02)00246-1zbMath1037.90030MaRDI QIDQ1869718

Hans Kellerer, Vitaly A. Strusevich

Publication date: 28 April 2003

Published in: European Journal of Operational Research (Search for Journal in Brave)




Related Items

Approximation algorithms for two parallel dedicated machine scheduling with conflict constraintsAlgorithms for the unrelated parallel machine scheduling problem with a resource constraintMachine scheduling with resource dependent processing timesParallel dedicated machines scheduling with chain precedence constraintsComplexity and approximation algorithms for two parallel dedicated machine scheduling with conflict constraintsResource leveling in a machine environmentScheduling on two identical machines with a speed-up resourceAn improved algorithm for parallel machine scheduling under additional resource constraintsA job-shop problem with one additional resource typeScheduling problems for parallel dedicated machines under multiple resource constraints.Restricted assignment scheduling with resource constraintsScheduling the two-machine open shop problem under resource constraints for setting the jobsScheduling parallel dedicated machines with the speeding‐up resourceFPTAS for the two identical parallel machine problem with a single operator under the free changing modeModels and matheuristics for the unrelated parallel machine scheduling problem with additional resourcesA combinatorial Benders decomposition algorithm for parallel machine scheduling with working-time restrictionsScheduling jobs with time-resource tradeoff via nonlinear programmingScheduling incompatible tasks on two machinesProduction, maintenance and resource scheduling: a reviewParallel machine scheduling with additional resources: notation, classification, models and solution methods



Cites Work