Single hoist cyclic scheduling with multiple tanks: A material handling solution
From MaRDI portal
Publication:1870835
DOI10.1016/S0305-0548(02)00043-6zbMath1026.90051MaRDI QIDQ1870835
Publication date: 14 May 2003
Published in: Computers \& Operations Research (Search for Journal in Brave)
mixed integer linear programmingoperations managementmaterial handlingmanufacturing processesindustrial engineeringbottleneck controlhoist scheduling problem
Mixed integer programming (90C11) Management decision making, including multiple objectives (90B50) Deterministic scheduling theory in operations research (90B35)
Related Items (8)
Mixed-integer linear programming method for multi-degree and multi-hoist cyclic scheduling with time windows ⋮ Scheduling multiple factory cranes on a common track ⋮ An efficient new heuristic for the hoist scheduling problem ⋮ A generalized classification scheme for crane scheduling with interference ⋮ One-dimensional vehicle scheduling with a front-end depot and non-crossing constraints ⋮ A genetic algorithm with tabu search procedure for flexible job shop scheduling with transportation constraints and bounded processing times ⋮ A solution for cyclic scheduling of multi-hoists without overlapping ⋮ Scheduling of a single crane in batch annealing process
Cites Work
This page was built for publication: Single hoist cyclic scheduling with multiple tanks: A material handling solution