Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

Scheduling with fuzzy delays and fuzzy precedences.

From MaRDI portal
Publication:1873188
Jump to:navigation, search

DOI10.1016/S0165-0114(02)00138-0zbMath1037.90032MaRDI QIDQ1873188

Milan Vlach, Shao Chin Sung, Kanesan Muthusamy, Hiroaki Ishii

Publication date: 19 May 2003

Published in: Fuzzy Sets and Systems (Search for Journal in Brave)


zbMATH Keywords

Fuzzy controlFuzzy system modelsMultiple criteria evaluation


Mathematics Subject Classification ID

Management decision making, including multiple objectives (90B50) Deterministic scheduling theory in operations research (90B35) Fuzzy control/observation systems (93C42) Fuzzy and other nonstochastic uncertainty mathematical programming (90C70)


Related Items (4)

SOME GENERAL PROPERTIES OF A FUZZY SINGLE MACHINE SCHEDULING PROBLEM ⋮ Setting due dates to minimize the total weighted possibilistic mean value of the weighted earliness-tardiness costs on a single machine ⋮ A possibilistic approach to sequencing problems with fuzzy parameters ⋮ Survey on fuzzy shop scheduling



Cites Work

  • Unnamed Item
  • One-machine generalized precedence constrained scheduling problems
  • Single machine, scheduling problem with fuzzy precedence relation
  • Optimal Sequencing of a Single Machine Subject to Precedence Constraints




This page was built for publication: Scheduling with fuzzy delays and fuzzy precedences.

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:1873188&oldid=14268880"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 1 February 2024, at 11:51.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki