Multiple asset replacement analysis under variable utilization and stochastic demand
From MaRDI portal
Publication:1876167
DOI10.1016/S0377-2217(03)00397-7zbMath1067.90073MaRDI QIDQ1876167
Publication date: 16 August 2004
Published in: European Journal of Operational Research (Search for Journal in Brave)
Stochastic programming (90C15) Management decision making, including multiple objectives (90B50) Dynamic programming (90C39)
Related Items (4)
Flexible lease contracts in the fleet replacement problem with alternative fuel vehicles: a real-options approach ⋮ A risk management system for sustainable fleet replacement ⋮ Minimum cost in a mix of new and old reusable items: an application to sizing a fleet of delivery trucks ⋮ Resource-constrained management of heterogeneous assets with stochastic deterioration
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- A framework for replacement analysis
- A model for equipment replacement due to technological obsolescence
- Capacity Expansion and Equipment Replacement: A Unified Approach
- Equipment Replacement Policy
- Planning Horizon Procedures for Machine Replacement Models
- Equipment replacement under technological change
- Parallel Replacement under Capital Rationing Constraints
- Planning horizon procedures for machine replacement models with several possible replacement alternatives
This page was built for publication: Multiple asset replacement analysis under variable utilization and stochastic demand