The construction of stable project baseline schedules

From MaRDI portal
Publication:1877894

DOI10.1016/S0377-2217(03)00130-9zbMath1056.90066OpenAlexW2122895234MaRDI QIDQ1877894

Roel Leus, Willy S. Herroelen

Publication date: 19 August 2004

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/s0377-2217(03)00130-9




Related Items (38)

A genetic algorithm for the robust resource leveling problemReactive and proactive single-machine scheduling to maintain a maximum number of starting timesA robust approach for the single machine scheduling problemScheduling for stability in single-machine production systemsA two-stage stochastic programming approach for project planning with uncertain activity durationsA hybrid simulation-optimization approach for the robust discrete time/cost trade-off problemA purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durationsNon-indexability of the stochastic appointment scheduling problem\(\Gamma\)-robust optimization of project scheduling problemsProject scheduling under the threat of catastrophic disruptionTabu search for proactive project scheduling problem with flexible resourcesMinimizing recovery cost of network optimization problemsA heuristic approach for resource constrained project scheduling with uncertain activity durationsTime slack-based techniques for robust project scheduling subject to resource uncertaintyReview of real-time vehicle schedule recovery methods in transportation servicesDominance-based linear formulation for the anchor-robust project scheduling problemMeta-heuristics for stable scheduling on a single machineUsing earned value management and schedule risk analysis with resource constraints for project controlAnchored reactive and proactive solutions to the CPM-scheduling problemManaging projects with uncertain deadlinesNew competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processingThe complexity of machine scheduling for stability with a single disrupted jobScenario-based approach for flexible resource loading under uncertaintyProject scheduling under uncertainty: survey and research potentialsOn the fallacy of averages in project risk managementSolve-and-robustifySelf-imposed time windows in vehicle routing problemsTriage Scheduling Optimization for Mass Casualty and Disaster ResponseDeveloping activity duration specification limits for effective project controlUsing schedule risk analysis with resource constraints for project controlThe proactive and reactive resource-constrained project scheduling problemA robust optimization approach for the multi-mode resource-constrained project scheduling problemA fuzzy robustness measure for the scheduling of commissioned product development projectsRailway scheduling reduces the expected project makespan over roadrunner scheduling in a multi-mode project scheduling environmentEvaluating project completion time in project networks with discrete random activity durationsMaximizing the number of jobs scheduled at their baseline starting times in case of machine failuresThe resource-constrained activity insertion problem with minimum and maximum time lagsResource allocation by means of project networks: Complexity results


Uses Software


Cites Work




This page was built for publication: The construction of stable project baseline schedules