A crane scheduling method for port container terminals

From MaRDI portal
Publication:1877918

DOI10.1016/S0377-2217(03)00133-4zbMath1062.90027MaRDI QIDQ1877918

Kap Hwan Kim, Young-Man Park

Publication date: 19 August 2004

Published in: European Journal of Operational Research (Search for Journal in Brave)




Related Items (60)

A Benders decomposition-based framework for solving quay crane scheduling problemsThe quay crane scheduling problem with time windowsA tabu search heuristic for the quay crane scheduling problemSome complexity results and an efficient algorithm for quay crane scheduling problemApproximation algorithm for uniform quay crane scheduling at container portsA follow-up survey of berth allocation and quay crane scheduling problems in container terminalsScheduling cranes at an indented berthCompact ILP formulations for a class of solutions to berth allocation and quay crane scheduling problemsHybrid evolutionary computation methods for quay crane scheduling problemsScheduling multiple factory cranes on a common trackApproaches for solving the container stacking problem with route distance minimization and stack rearrangement considerationsOn double cycling for container port productivity improvementA heuristic for the quay crane scheduling problem based on contiguous bay crane operationsA reclaimer scheduling problem arising in coal stockyard managementExact methods for the quay crane scheduling problem when tasks are modeled at the single container levelThe crane scheduling problem: models and solution approachesSimultaneous Allocation of Berths and Quay Cranes under Discrete Berth SituationMinimization of the total traveling distance and maximum distance by using a transformed-based encoding EDA to solve the multiple traveling salesmen problemA tabu search algorithm for the integrated scheduling problem of container handling systems in a maritime terminalCombining mixed integer programming and constraint programming to solve the integrated scheduling problem of container handling operations of a single vesselSequencing dual-spreader crane operations: mathematical formulation and heuristic algorithmAn innovative operation‐time‐space network for solving different logistic problems with capacity and time constraintsSolving the single crane scheduling problem at rail transshipment yardsMIP approaches for the integrated berth allocation and quay crane assignment and scheduling problemModeling and optimization of decision-making process during loading and unloading operations at container portA generalized classification scheme for crane scheduling with interferenceHandling uncertainty in the quay crane scheduling problem: a unified distributionally robust decision modelModeling and Design of Container Terminal OperationsAn improved discrete PSO for tugboat assignment problem under a hybrid scheduling rule in container terminalMulti objective optimization of coordinated scheduling of cranes and vehicles at container terminalsAn evolutionary approach to a combined mixed integer programming model of seaside operations as arise in container portsScheduling quay cranes and yard trucks for unloading operations in container portsIntegrated scheduling of handling equipment at automated container terminalsThe quay crane scheduling problem with non-crossing and safety clearance constraints: an exact solution approachVehicle Routing Problems and Container Terminal Operations – An Update of ResearchA queuing network model for the management of berth crane operationsA Lagrangian relaxation-based heuristic for the multi-ship quay crane scheduling problem with ship stability constraintsApproximate the scheduling of quay cranes with non-crossing constraintsThe study of the unidirectional quay crane scheduling problem: complexity and risk-aversionStochastic modeling of unloading and loading operations at a container terminal using automated lifting vehiclesOperations research at container terminals: a literature updateAn effective mathematical formulation for the unidirectional cluster-based quay crane scheduling problemModeling and solving rich quay crane scheduling problemsA fast heuristic for quay crane scheduling with interference constraintsContainer sequencing for quay cranes with internal reshufflesSimulation-based optimization for discharge/loading operations at a maritime container terminalAn exact algorithm for the unidirectional quay crane scheduling problem with vessel stabilityThe traveling salesman puts-on a hard hat -- tower crane scheduling in construction projectsAn integrated approach for modeling and solving the scheduling problem of container handling systemsIntegrating simulation and optimization to schedule loading operations in container terminalsModeling and solution of the joint quay crane and truck scheduling problemMultiple crane scheduling in a batch annealing process with no-delay constraints for machine unloadingA local branching-based algorithm for the quay crane scheduling problem under unidirectional schedulesDynamic programming algorithms for the general quay crane double-cycling problem with internal-reshufflesScheduling for multi-robot routing with blocking and enabling constraintsDiscrete time model and algorithms for container yard crane schedulingA survey of berth allocation and quay crane scheduling problems in container terminalsA Lagrangian relaxation approach for solving the integrated quay crane assignment and scheduling problemA joint quay crane assignment and scheduling problem: formulation, solution algorithm and computational resultsA new crossover approach for solving the multiple travelling salesmen problem using genetic algorithms



Cites Work




This page was built for publication: A crane scheduling method for port container terminals