Lot streaming models with a limited number of capacitated transporters in multistage batch production systems
From MaRDI portal
Publication:1879789
DOI10.1016/S0305-0548(03)00159-XzbMath1100.90507OpenAlexW1980622810MaRDI QIDQ1879789
Chia-Hsin Lee, Jen-Huei Chang, Huan Neng Chiu
Publication date: 23 September 2004
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0305-0548(03)00159-x
Related Items (3)
A study on integration of lot sizing and flow shop lot streaming problems ⋮ Lot streaming multiple jobs in a flow shop ⋮ A simulated annealing with multiple-search paths and parallel computation for a comprehensive flowshop scheduling problem
Cites Work
- Optimal lot streaming for multiple products in a two-machine flow shop
- Lot streaming with detached setups in three-machine flow shops
- Structural Properties of Lot Streaming in a Flow Shop
- Two- and three-machine flow shop scheduling problems with equal sized transfer batches
- Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model
- Basic Techniques for Lot Streaming
- Lot Streaming in a Two-stage Flow Shop with Set-up, Processing and Removal Times Separated
This page was built for publication: Lot streaming models with a limited number of capacitated transporters in multistage batch production systems