Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

A note on minimizing maximum lateness in a two-machine no-wait flowshop

From MaRDI portal
Publication:1879796
Jump to:navigation, search

DOI10.1016/S0305-0548(03)00162-XzbMath1100.90508OpenAlexW1982292026MaRDI QIDQ1879796

Parthasarati Dileepan

Publication date: 23 September 2004

Published in: Computers \& Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/s0305-0548(03)00162-x


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35)


Related Items

A survey of scheduling problems with setup times or costs, A survey of scheduling problems with no-wait in process, Accelerated tabu search for no-wait flowshop scheduling problem with maximum lateness criterion



Cites Work

  • Total flowtime in no-wait flowshops with separated setup times.
  • Heuristics for two-machine no-wait flowshop scheduling with an availability constraint
  • No-wait flowshops with bicriteria of makespan and total completion time
  • A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process
  • NP-hardness of compact scheduling in simplified open and flow shops.
  • A new heuristic and dominance relations for no-wait flowshops with setups
  • Batch scheduling in the no-wait two-machine flowshop to minimize the makespan
Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:1879796&oldid=14280668"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 1 February 2024, at 12:59.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki