Flow-shop scheduling for three serial stations with the last two duplicate
From MaRDI portal
Publication:1886869
DOI10.1016/j.cor.2003.08.010zbMath1061.90044OpenAlexW2079033567MaRDI QIDQ1886869
Bandar Al-Harbi, Ahmet Bolat, Ibrahim Al-Harkan
Publication date: 19 November 2004
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.cor.2003.08.010
Polyhedral combinatorics, branch-and-bound, branch-and-cut (90C57) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Two branch and bound algorithms for the permutation flow shop problem
- Sequencing jobs for an automated manufacturing module with buffer
- A hybrid three-stage flowshop problem: Efficient heuristics to minimize makespan
- Algorithms for real-time scheduling of jobs on mixed model assembly lines
- A genetic algorithm for flowshop sequencing
- Total flowtime in no-wait flowshops with separated setup times.
- Two-Stage, Hybrid Flowshop Scheduling Problem
- Flowshop scheduling with limited temporary storage
- The Complexity of Flowshop and Jobshop Scheduling
- A New Heuristic for Three-Machine Flow Shop Scheduling
- Scheduling duplicate serial stations in transfer lines
- Modeling and Analysis of Three-Stage Transfer Lines with Unreliable Machines and Finite Buffers