Resolution of a scheduling problem in a flowshop robotic cell
From MaRDI portal
Publication:1887770
DOI10.1016/j.ejor.2003.08.028zbMath1065.90042OpenAlexW2131843020MaRDI QIDQ1887770
Ameur Soukhal, Patrick Martineau
Publication date: 22 November 2004
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2003.08.028
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (3)
A scheduling problem in blocking hybrid flow shop robotic cells with multiple robots ⋮ Cyclic scheduling of parts and robot moves in \(m\)-machine robotic cells ⋮ Scheduling on parallel machines with preemption and transportation delays
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Combinatorial optimization models for production scheduling in automated manufacturing systems
- Cycles and permutations in robotic cells
- A generalized permutation approach to job shop scheduling with genetic algorithms
- ON AN AUTOMATED TWO-MACHINE FLOWSHOP SCHEDULING PROBLEM WITH INFINITE BUFFER
- A comparison of heuristics for family and job scheduling in a flow-line manufacturing cell
- Minimizing Cycle Time in a Blocking Flowshop
- A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process
This page was built for publication: Resolution of a scheduling problem in a flowshop robotic cell