Single item lot-sizing problems with backlogging on a single machine at a finite production rate

From MaRDI portal
Publication:1887789

DOI10.1016/j.ejor.2003.04.001zbMath1067.90036OpenAlexW2085067859MaRDI QIDQ1887789

Yuyue Song, Gin Hor Chan

Publication date: 22 November 2004

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2003.04.001




Related Items (4)



Cites Work




This page was built for publication: Single item lot-sizing problems with backlogging on a single machine at a finite production rate