Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

A heuristic for parallel machine scheduling with agreeable due dates to minimize the number of late jobs

From MaRDI portal
Publication:1891237
Jump to:navigation, search

DOI10.1016/0305-0548(94)00027-6zbMath0827.90075OpenAlexW2012377923MaRDI QIDQ1891237

Chung-Lun Li

Publication date: 30 May 1995

Published in: Computers \& Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/0305-0548(94)00027-6


zbMATH Keywords

identical parallel machinesdifferent due dates and release times


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35) Dynamic programming (90C39)


Related Items

Minimizing the weighted number of tardy jobs on multiple machines: a review



Cites Work

  • Unnamed Item
  • Unnamed Item
  • Unnamed Item
  • A dynamic programming algorithm for preemptive scheduling of a single machine to minimize the number of late jobs
  • Preemptive Scheduling of Two Uniform Machines to Minimize the Number of Late Jobs
  • Linear-Time Algorithms for Scheduling on Parallel Processors
  • A Solvable Case of the One-Machine Scheduling Problem with Ready and Due Times
  • An n Job, One Machine Sequencing Algorithm for Minimizing the Number of Late Jobs
  • On Sequencing n Jobs on One Machine to Minimize the Number of Late Jobs
  • A Simple Optimality Proof of Moore's Sequencing Algorithm
Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:1891237&oldid=14295259"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 1 February 2024, at 13:12.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki