Joint investment in quality improvement and setup reduction

From MaRDI portal
Publication:1892664

DOI10.1016/0305-0548(94)00054-CzbMath0830.90066OpenAlexW2022649229MaRDI QIDQ1892664

Jae-Dong Hong, Jack C. Hayya

Publication date: 1995

Published in: Computers \& Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/0305-0548(94)00054-c




Related Items (20)

Optimal production run length and capital investment in quality improvement with an imperfect production processTwo-echelon supply chain model with manufacturing quality improvement and setup cost reductionComputational algorithmic procedure for optimal inventory policy involving ordering cost reduction and back-order discounts when lead time demand is controllableA two stage supply chain model with selling price dependent demand and investment for quality improvementJust-in-time purchasing: an integrated inventory model involving deterministic variable lead time and quality improvement investmentFuzzy opportunity cost for EOQ model with quality improvement investmentQuality improvement, setup cost and lead-time reductions in lot size reorder point models with an imperfect production processOptimal production run time for two-stage production system with imperfect processes and allowable shortagesEffective investment to reduce setup cost in a mixture inventory model involving controllable backorder rate and variable lead time with a service level constraintAn EPQ model with setup cost and process quality as functions of capital expenditureInventory and investment in setup and quality operations under return on investment maximizationAn integrated inventory model with ordering cost and setup cost reductions under just-in-time purchasingInvesting in setup reduction in the EOQ Model with random yields under a Limited Capital BudgetThe value of setup cost reduction and process improvement for the economic production quantity model with defectsInventory and investment in quality improvement under return on investment maximizationAn optimal setup cost reduction and lot size for economic production quantity model with imperfect quality and quantity discountsOptimal production cycles, procurement schedules, and joint investment in an imperfect production systemJoint dynamic pricing and investment strategy for perishable foods with price-quality dependent demandShortening cycle times in multi-product, capacitated production environments through quality level improvements and setup reductionEvaluation of supply chain with quality improvement under trade credit and freight rate discount



Cites Work




This page was built for publication: Joint investment in quality improvement and setup reduction