How to make OR-results available: A proposal for project scheduling
From MaRDI portal
Publication:1897419
DOI10.1007/BF02032383zbMath0830.90074OpenAlexW2170320148MaRDI QIDQ1897419
Publication date: 30 January 1996
Published in: Annals of Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/bf02032383
Management decision making, including multiple objectives (90B50) Deterministic scheduling theory in operations research (90B35) Theory of languages and software systems (knowledge-based systems, expert systems, etc.) for artificial intelligence (68T35)
Related Items
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- On the facial structure of scheduling polyhedra
- Single-Machine Scheduling Polyhedra with Precedence Constraints
- An Introduction to Graph-Based Modeling Systems, Part II: Graph-Grammars and the Implementation
- A Computational Study of the Job-Shop Scheduling Problem
- Sequencing Jobs to Minimize Total Weighted Completion Time Subject to Precedence Constraints
- Flow diagrams, turing machines and languages with only two formation rules