A maximum principle based combined method for scheduling in a flexible manufacturing system
From MaRDI portal
Publication:1902498
DOI10.1007/BF01439152zbMath0837.90061OpenAlexW1971526798MaRDI QIDQ1902498
Konstantin Kogan, Eugene Khmelnitsky, Oded Z. Maimon
Publication date: 13 May 1996
Published in: Discrete Event Dynamic Systems (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/bf01439152
Dynamic programming in optimal control and differential games (49L20) Deterministic scheduling theory in operations research (90B35) Production models (90B30)
Related Items (5)
Scheduling concurrent production over a finite planning horizon: Polynomially solvable cases ⋮ Dynamic generalized assignment problems with stochastic demands and multiple agent-task relationships ⋮ Optimal control of assembling complexes under predetermined maintenance conditions ⋮ Capacity planning by the dynamic multi-resource generalized assignment problem (DMRGAP) ⋮ Scheduling one-part-type serial manufacturing system under periodic demand: A solvable case
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Optimal control of production rate in a failure prone manufacturing system
- Production control of a manufacturing system with multiple machine states
- Optimality of Zero-Inventory Policies for Unreliable Manufacturing Systems
- Necessary optimality conditions for a generalized problem of production scheduling
- Value function approximation via linear programming for FMS scheduling
This page was built for publication: A maximum principle based combined method for scheduling in a flexible manufacturing system