Production breaks and the learning curve: The forgetting phenomenon
From MaRDI portal
Publication:1913064
DOI10.1016/0307-904X(95)00157-FzbMath0845.92028OpenAlexW1994638726MaRDI QIDQ1913064
Maurice Bonney, Mohamad Y. Jaber
Publication date: 22 May 1996
Published in: Applied Mathematical Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0307-904x(95)00157-f
lot sizingminimum total inventory system costoptimum production quantityminimum breakintermittent productionforgetting slopelearning slope
Related Items
Learning curves for processes generating defects requiring reworks, Unnamed Item, Worker deployment in dual resource constrained systems with a task-type factor, Optimal lot sizing with regular maintenance interruptions, A comparative study of learning curves with forgetting, Unnamed Item, The effects of learning on the optimal production lot size for deteriorating and partially backordered items with time varying demand and deterioration rates, Fuzzy Based Inventory Model with Credit Financing Under Learning Process, Economic lot sizing with the consideration of random machine unavailability time, Fuzzy production inventory model for deteriorating items with shortages under the effect of time dependent learning and forgetting: a possibility/necessity approach, An interference-adjusted power learning curve for tasks with cognitive and motor elements, Optimal ordering and production policy for a recoverable item inventory system with learning effect, Observations on the economic manufacture quantity model with learning and forgetting, Modelling worker reliability with learning and fatigue, Incorporating human fatigue and recovery into the learning-forgetting process, Learning effects and the phenomenon of moving bottlenecks in a two-stage production system, Learning curve parameter estimation beyond traditional statistics, An almost learning curve model for manual assembly performance improvement, A closed-loop supply chain model with learning effect, random return and imperfect inspection under price- and quality-dependent demand, A note on single-machine scheduling with sum-of-processing-time-based learning and forgetting effects, The lot size problem and the learning curve: a review of mathematical modeling (1950's--2020), Imperfect production process with learning and forgetting effects
Cites Work