A sequencing problem with family setup times
From MaRDI portal
Publication:1917311
DOI10.1016/0166-218X(94)00139-5zbMath0854.68009OpenAlexW2162833856MaRDI QIDQ1917311
Publication date: 7 July 1996
Published in: Discrete Applied Mathematics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0166-218x(94)00139-5
Related Items (2)
Single-machine scheduling with advanced process control constraints ⋮ Fuzzy scheduling of job orders in a two-stage flowshop with batch-processing machines
Cites Work
- Unnamed Item
- Unnamed Item
- A note on minimizing maximum lateness in a one-machine sequencing problem with release dates
- A block approach for single-machine scheduling with release dates and due dates
- An algorithm for single machine sequencing with release dates to minimize maximum cost
- The one-machine sequencing problem
- Approximation algorithms for single-machine sequencing with delivery times and unit batch set-up times
- Preemptive scheduling with release dates, delivery times and sequence independent setup times
- OPTIMAL SCHEDULE IN A GT-TYPE FLOW-SHOP UNDER SERIES-PARALLEL PRECEDENCE CONSTRAINTS
- The Shifting Bottleneck Procedure for Job Shop Scheduling
- PERFORMANCE ANALYSIS OF SIX APPROXIMATION ALGORITHMS FOR THE ONE-MACHINE MAXIMUM LATENESS SCHEDULING PROBLEM WITH READY TIMES
- Technical Note—Analysis of a Heuristic for One Machine Sequencing with Release Dates and Delivery Times
- Jackson's Rule for Single-Machine Scheduling: Making a Good Heuristic Better
- Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and Complexity
- Minimizing maximum lateness on one machine: computational experience and some applications
- On the Complexity of Scheduling with Batch Setup Times
This page was built for publication: A sequencing problem with family setup times