Single machine scheduling to minimize the number of early and tardy jobs

From MaRDI portal
Publication:1919786

DOI10.1016/0305-0548(95)00078-XzbMath0854.90081OpenAlexW2003673940MaRDI QIDQ1919786

Avital Lann, Gur Mosheiov

Publication date: 24 July 1996

Published in: Computers \& Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/0305-0548(95)00078-x




Related Items

Maximizing the weighted number of just-in-time jobs in flow shop schedulingProportionate flow shop scheduling with multi-agents to maximize total gains of JIT jobsMulti-agent scheduling in a no-wait flow shop system to maximize the weighted number of just-in-time jobsA quadratic time algorithm to maximize the number of just-in-time jobs on identical parallel machinesJust-In-Time Scheduling with Generalized Due Dates and Identical Due Date IntervalsTwo-agent flowshop scheduling to maximize the weighted number of just-in-time jobsMinimizing the weighted number of early and tardy jobs in a stochastic single machine scheduling problemMaximizing weighted number of just-in-time jobs on unrelated parallel machinesA survey of single machine scheduling to minimize weighted number of tardy jobsAn improved FPTAS for maximizing the weighted number of just-in-time jobs in a two-machine flow shop problemMaximizing the weighted number of just-in-time jobs on a single machine with position-dependent processing timesMaximizing the weighted number of just‐in‐time jobs in a distributed flow‐shop scheduling systemScheduling to maximize the weighted number of on-time jobs on parallel machines with bounded job-rejectionA state-of-the-art survey on multi-scenario schedulingScheduling to Maximize the Number of Just-in-Time Jobs: A SurveyA note: maximizing the weighted number of just-in-time jobs for a given job sequenceParameterized multi-scenario single-machine scheduling problemsThe just-in-time scheduling problem in a flow-shop scheduling systemMaximizing the weighted number of just-in-time jobs in~several two-machine scheduling systemsA note on the maximum number of on-time jobs on parallel identical machines.A note: Maximizing the weighted number of just-in-time jobs on a proportionate flowshopA note: minimizing maximum earliness on a proportionate flowshopScheduling with common due date assignment to minimize generalized weighted earliness-tardiness penaltiesA just-in-time scheduling problem with two competing agentsTwo-agent single-machine scheduling problem with just-in-time jobsSingle-machine scheduling with a common due windowJust-in-time scheduling with controllable processing times on parallel machinesScheduling of parallel identical machines to maximize the weighted number of just-in-time jobsOn the parameterized tractability of the just-in-time flow-shop scheduling problemJUST-IN-TIME SCHEDULING UNDER SCENARIO-BASED UNCERTAINTYScheduling a single machine to minimize earliness penalties subject to the SLK due-date determination methodNear-optimal heuristics for just-in-time jobs maximization in flow shop schedulingOn the tractability of hard scheduling problems with generalized due-dates with respect to the number of different due-dates



Cites Work