Application of fuzzy distributions on project management
From MaRDI portal
Publication:1920255
DOI10.1016/0165-0114(94)00309-UzbMath0855.90056OpenAlexW2078180292MaRDI QIDQ1920255
Don-Lin Mon, Han-Chung Lu, Ching-Hsue Cheng
Publication date: 3 February 1997
Published in: Fuzzy Sets and Systems (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0165-0114(94)00309-u
Stochastic network models in operations research (90B15) Deterministic scheduling theory in operations research (90B35) Fuzzy and other nonstochastic uncertainty mathematical programming (90C70)
Related Items (14)
An evaluation approach to engineering design in QFD processes using fuzzy goal programming models ⋮ Fuzzy critical path method based on ranking methods using hexagonal fuzzy numbers for decision making ⋮ Application of C‐uncertain variables and systemic approach to resource distribution in a class of operation systems ⋮ Developing a heuristic algorithm for order production planning using network models under uncertainty conditions ⋮ Applying fuzzy method for measuring criticality in project network ⋮ Time-cost trade-off analysis of project networks in fuzzy environments ⋮ Intuitionistic fuzzy multi-criteria group decision making with an application to critical path selection ⋮ A fuzzy nonlinear model for quality function deployment considering Kano's concept ⋮ A new supplier performance evaluation model ⋮ Critical path analysis in the network with fuzzy activity times ⋮ A zero-one goal programming approach for project selection ⋮ A simple approach to fuzzy critical path analysis in project networks ⋮ Computing latest starting times of activities in interval-valued networks with minimal time lags ⋮ Fuzzy temporal characteristics of operations for project management on the network models basis
Cites Work
This page was built for publication: Application of fuzzy distributions on project management