Scheduling of a machining center
From MaRDI portal
Publication:1922204
DOI10.1016/0895-7177(96)00073-8zbMath0856.90057OpenAlexW1994540454MaRDI QIDQ1922204
Publication date: 15 September 1996
Published in: Mathematical and Computer Modelling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0895-7177(96)00073-8
Integer programming (90C10) Deterministic scheduling theory in operations research (90B35) Production models (90B30)
Related Items (8)
The control of a conveyor under the economical aspect ⋮ An experimental approach of optimum material removal rate under fixed tool life ⋮ Optimal approach for dynamic production control and workforce allocation of machining project ⋮ Optimum workforce strategy for production handling ⋮ An approach to optimum production policy of automated manufacturing project ⋮ Inventory model with a one-time opportunity to order extra items ⋮ Production planning of a robot-served machine under probabilistic market demand and fixed selling time ⋮ Dynamic machining control and scheduling for multiple production projects in a deterministic period
Cites Work
This page was built for publication: Scheduling of a machining center