Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
A mixed integer programming model for long term capacity expansion planning: a case study from the Hunter valley coal chain - MaRDI portal

A mixed integer programming model for long term capacity expansion planning: a case study from the Hunter valley coal chain

From MaRDI portal
Publication:1926728

DOI10.1016/j.ejor.2012.01.012zbMath1253.90157OpenAlexW2012301765MaRDI QIDQ1926728

Andreas T. Ernst, Palitha Welgama, Gaurav Singh, Rob Oyston, Tracey Giles, Olena Gavriliouk, David Sier

Publication date: 29 December 2012

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2012.01.012




Related Items



Cites Work